Follow Us

Breaking News

PM Modi to launch development projects worth 19,100 crore in Bulandshahr today

BULANDSHAHR: Prime Minister Narendra Modi will visit Bulandshahr in UP and Jaipur in Rajasthan on 25th January.

At around 1:45 PM, Prime Minister will inaugurate and dedicate to nation multiple development projects worth over Rs. 19,100 crores in Bulandshahr. The projects  are related to several important sectors like rail, road, oil and gas and urban development & Housing.

At around 5:30 PM, Prime Minister will welcome French President Emmanuel Macron in Jaipur. Prime Minister, along with President Emmanuel Macron, will visit various places of cultural and historical significance in the city, including Jantar Mantar and Hawa Mahal.

During the programme in Bulandshahr UP, Prime Minister will dedicate to nation the 173 Km long double line electrified section between New Khurja - New Rewari on Dedicated Freight Corridor (DFC) by flagging off goods trains from the two stations through video conferencing.

Prime Minister will also dedicate to nation the fourth line connecting Mathura - Palwal section & Chipiyana Buzurg - Dadri section. These new lines will improve the rail connectivity of the national capital to Southern Western & Eastern India.

Prime Minister will dedicate multiple road development projects to nation. The projects include Aligarh to Bhadwas four laning work Package-1 (part of Aligarh-Kanpur Section of NH-34); widening of Meerut to Karnal border via Shamli (NH-709A); and four laning of Shamli-Muzaffarnagar section of NH-709 AD Package-II.

These road projects, developed at a cumulative cost of more than Rs 5000 crore will improve connectivity and help in the economic development in the region.

During the programme, Prime Minister will also inaugurate Indian Oil's  Tundla-Gawaria Pipeline. Built at a cost of about Rs 700 crore, this 255 km long pipeline project has been completed well ahead of the scheduled time. The project will help in transportation of petroleum products from Tundla to Gawaria T-Point of Barauni-Kanpur Pipeline with pumping facilities at Mathura and Tundla and delivery facilities at Tundla, Lucknow and Kanpur.

 

 

 Prime Minister will also dedicate to nation ‘Integrated Industrial Township at Greater Noida’ (IITGN). It has been developed in line with the Prime Minister’s vision of  integrated planning and coordinated implementation of infrastructure connectivity projects under PM-GatiShakti.

 Built at a cost of Rs. 1,714 crore, the project is spread over 747 acres and is located near the intersection of Eastern and Western Dedicated Freight Corridors with  Eastern Peripheral Expressway to the south and the Delhi-Howrah broad gauge railway line to the east.

 IITGN’s strategic location ensures unparalleled connectivity as other infrastructure for multi modal connectivity are present in the vicinity of this project viz. Noida-Greater Noida Expressway (5 km), Yamuna Expressway (10 km), Delhi Airport (60 km), Jewar Airport (40 km), Ajaibpur Railway Station (0.5 km) and New Dadri DFCC Station (10 km). The project marks a significant step towards fostering industrial growth, economic prosperity, and sustainable development in the region.

During the programme, Prime Minister will also inaugurate renovated Mathura sewerage scheme including construction of sewage treatment plant (STP) at a cost of about Rs 460 crore. This work includes construction of 30 MLD STP at Masani, rehabilitation of existing 30  MLD at Trans Yamuna and 6.8  MLD STP at Masani & construction of 20 MLD TTRO plant (Tertiary Treatment and Reverse Osmosis Plant).

Prime Minister will also inaugurate Moradabad (Ramganga) sewerage system & STP works (Phase I). The project built at cost of about Rs 330 crore, consists of 58 MLD STP, about 264 km sewerage network and nine sewage pumping stations for pollution abatement of Ramganga River at Moradabad.

Related India News

Odisha man brings sister’s skeleton to withdraw money from Bank

 A shocking incident was reported from Odisha’s Keonjhar district where a tribal man exhumed his deceased sister’s remains and brought her skeleton to a bank in a desperate attempt to withdraw money from her account, police said on 27 April. The incident took place at the Maliposi b....

West Bengal Elections: Campaigning Ends for Second Phase, Voting on 29 April for 142 Seats

KOLKATA: Campaigning for the second and final phase of the West Bengal Assembly elections concluded on Monday evening at 6 PM, with the 48-hour silence period began. In the campaigning, the ruling Trinamool Congress and the BJP accused each other fiercely on issues such as the Special Intensive Rev....

Bengal Elections: TMC MP Mitali Bag Attacked in Hooghly, Hospitalized; Party Blames BJP

KOLKATA: Trinamool Congress (TMC) MP Mitali Bag from Arambagh was injured in an attack on Monday afternoon in Goghat area of Hooghly district. The attack occurred when she was on her way to attend an election rally of TMC national general secretary Abhishek Banerjee. The TMC MP has accused BJP suppo....

First Phase West Bengal Elections : 92% Voting Amid Violence, EVM Malfunctions, and Allegations

KOLKATA :  In the first phase of the West Bengal Assembly elections, voters turned out in large numbers, with nearly 92% polling recorded across 152 seats. This phase spanned diverse regions—from the misty hills of North Bengal to the scorching plains of the south.  This record ....

Assembly Elections : 91.46% Voting in West Bengal, 84.41% in Tamil Nadu

 Voters showed tremendous enthusiasm during the first phase of polling in West Bengal and in Tamil Nadu. The Election Commission released the estimated voting trends till 5 PM. According to the figures, Tamil Nadu recorded approximately 84.41% polling, while the first phase in West Bengal saw a....

Links
Contact
Editor :
Jagadananda Pradhan
Email :
fastmail@yahoo.com
For Ads :
fastmailads@gmail.com
Ph : (+91)6764295999
Contact Us
© 2026 Fast Mail Media Pvt Ltd. All Rights Reserved.
Powered by : FM Media Pvt Ltd.
Developed by : Futuradept Tech